Stop the Eden Landing Data Center — Protect Hayward's Water, Power, and Air

Hayward City Council; California Energy Commission (Docket 23-SPPE-01); CA State Senator Aisha Wahab

**NOTE: This is an UPDATE (beginning Aug 13 2026) of the original petition.
1. Our ask has been strengthened from a "moratorium" to a "ban," which is a stronger permanent ask compared to a moratorium's conditional and temporary framing.
2.The petition previously asked the CEC/Council to require a full Environmental Impact Report (EIR) in place of the existing Mitigated Negative Declaration (MND). That ask is no longer realistic: the 30-day CEQA statute of limitations to challenge the May 2025 MND/SPPE approval expired around June 14, 2025, and the project's vested rights under that approval make a forced EIR extremely unlikely to survive a legal challenge — a risk City officials, including Mayor Pro Tem George Syrop, have publicly acknowledged ([Mercury News](https://www.mercurynews.com/2026/07/21/hayward-approved-a-massive-data-center-then-it-rewrote-the-rules/)). Meanwhile, on September 15, 2026, the Hayward City Council is taking up a real, live legislative referral to ban future data centers and require monitoring/reporting on facilities already approved or operating, including SVY03A ([hayward-ca.gov](https://www.hayward-ca.gov/discover/news/aug26/hayward-council-consider-move-ban-data-centers-its-sept-15-meeting)). This update points the petition at that actual vehicle instead of an ask the City legally cannot deliver.**
  • Sign now: Prevent STACKS SVY03A Data Center from harming the environment

  • 76.6 MW, 28 diesel generators, zero City Council vote

  • 2 minutes to protect Hayward's water and power grid, please sign this petition

Body:

Dear Hayward Residents,

A massive data center is being built at 26062 Eden Landing Road — 310,000 square feet, 76.6 megawatts of capacity (enough to power roughly 76,000 homes), and 28 diesel backup generators, sited close to our neighborhoods and the Eden Landing shoreline.

Here's the part that should concern everyone: this project was approved by the Planning Commission in 2025 without a single City Council vote, through a zoning loophole. The City has since admitted the process was flawed and rewrote its own rules so that any future data center over 50 MW must go before the elected Council. SVY03A is well over that threshold — but it already got through under the old rules; SVY03A got a lightweight environmental review with no binding public reporting (they got a Mitigated Negative Declaration, not a full, Environmental Impact Report despite a local conservation group, Mission Peak Conservation, asking the state to require a full EIR but was turned down).

On September 15, 2026, the Council is considering a referral to ban future data centers and require monitoring/reporting on existing ones. This petition asks them to make that binding. We are also asking the City Council to require independently verified public monitoring of SVY03A's actual water, wastewater, and energy use, a full Council hearing and vote before any future expansion or added generators, real enforcement with penalties for noncompliance, the same standard applied to every data center in Hayward, and adoption of the proposed ban on new data centers.

Sign to demand real transparency, attach monitoring and enforcement conditions, and a ban on all future data centers.

It takes 30 seconds to add your name:

We plan to deliver these signatures in person at the next City Council meeting and file them with the California Energy Commission. If you know neighbors who'd want to sign, please forward this email or share the link directly — every signature helps.

Thanks for standing up for our community,
Hayward Residents Against SVY03A

Petition by
Valerie Cooper
Hayward Residents

To: Hayward City Council; California Energy Commission (Docket 23-SPPE-01); CA State Senator Aisha Wahab
From: [Your Name]

We, the undersigned residents of Hayward, call on the Hayward City Council to impose binding, independently verified monitoring, public reporting, and real enforcement on the STACK Infrastructure SVY03A Data Center Campus at 26062 Eden Landing Road — and on every other data center already approved or operating in Hayward — while the Council still has the chance to attach these conditions.

An environmental review was conducted — a Mitigated Negative Declaration, prepared by the California Energy Commission because STACK sought a Small Power Plant Exemption, which made the CEC (not the City) the CEQA lead agency. The CEC adopted that MND and granted the exemption in May 2025. A local conservation group, Mission Peak, formally urged the CEC to require a full Environmental Impact Report instead, a request the Commission did not adopt. The 30-day legal window to challenge that decision in court has since closed, and City officials — including Mayor Pro Tem George Syrop — have publicly confirmed that forcing a full EIR at this point would expose Hayward to a lawsuit it would likely lose under California’s vested-rights doctrine (Mercury News).

We are not asking the City to relitigate a fight the law says is over. What the City can still do is attach new, forward-looking monitoring and reporting conditions to a facility already operating here — and on September 15, 2026, the Council is already considering a referral to do exactly that, alongside a ban on future data centers (hayward-ca.gov). This petition asks the Council to make that process binding and enforceable, not just a discretionary promise.

Separately, the Hayward Planning Commission approved this 310,000-square-foot facility in May 2025 without ever bringing it before the elected City Council — a decision made possible only by a zoning loophole the City has since admitted was a mistake by rewriting its own rules to require Council review for any future data center over 50 megawatts. SVY03A itself, at 76.6 megawatts, would never be approved administratively under the City’s own new standard. We believe that same scrutiny should apply to any future expansion, added generator, or capacity increase at this facility.

Our concerns:

1. Water: Industrial-scale cooling and wastewater discharge in a region already facing water stress, with no public accounting of the facility’s draw on local supply — CEC filings show the project may discharge up to 56,800 gallons of wastewater per day.

2. Power grid strain: Electrical capacity equivalent to powering roughly 76,000 homes, drawn by a single private facility.

3. Diesel emissions: 28 backup diesel generators sited near residential neighborhoods and the Eden Landing shoreline/estuary, with real air quality consequences.

4. Noise, heat, and traffic from 24/7 industrial operation in a community setting.

5. Process: Approval granted with minimal public notice and no City Council vote on a project of this scale.

We are asking for:

1. Legally binding, independently verified public reporting of SVY03A’s actual water, wastewater, and energy use — including peak-day figures, not just annual averages — audited by a City-selected third party, not self-reported by STACK.

2. A full City Council hearing and public vote before any future expansion, added generator, or capacity increase at SVY03A, applying the same 50 MW review standard the City now requires for new projects.

3. Real enforcement: a defined, escalating penalty schedule for noncompliance or underreporting, and a public complaint portal for noise, odor, and emissions concerns.

4. The same monitoring, reporting, and enforcement standard applied to every data center already approved or operating in Hayward — not SVY03A alone.

5. Adoption of the ban on new hyperscale data center development in Hayward already proposed in the City’s Sept. 15, 2026 referral.

Thank you for your time. We urge you to use your leadership and commitment to protect Hayward's residential community as well as its ecological and natural heritage.

Sourcing for the claims above:
• CEC Notice of Intent to Adopt a Mitigated Negative Declaration, explaining the SPPE process and CEC’s role as CEQA lead agency: efiling.energy.ca.gov, TN 262298
• CEC Order No. 25-0508-11 adopting the Final IS/MND and granting the SPPE, May 8, 2025: energy.ca.gov
• Local conservation group’s comment letter urging the CEC to require a full EIR instead of an MND, March 26, 2025: efiling.energy.ca.gov, TN 262374
• CEQAnet Notice of Determination for SVY03A, posted May 15, 2025 (starts the 30-day CEQA statute of limitations): ceqanet.lci.ca.gov
• Mercury News reporting on Hayward’s zoning rewrite and Mayor Pro Tem George Syrop’s comments on litigation/vested-rights risk: mercurynews.com
• City of Hayward announcement of the Sept. 15, 2026 Council referral to ban future data centers and require monitoring/reporting on existing ones: hayward-ca.gov
• Hayward Planning Commission staff report certifying the IS/MND and approving the site plan/permit, May 22, 2025: hayward.legistar.com
• City of Hayward’s Data Center Development Applications page (confirms 76.6 MW capacity, CEQA review requirement, 50 MW Council-review threshold): hayward-ca.gov